Project: Tesco Newtownards

Client: Mc Laughlin and Harvey

Duration: 26 weeks

We carried out the groundworks on this project under a very tight timeframe. Works included levelling a piling platform across the complete site, then following behind and cutting approx. 3350nr concrete piles. Once these were cut, all foundation works, drainage and service ducts had to be installed on suspended brackets throughout the site, and  areas graded to allow for  a reinforced concrete slab to be poured over the complete site. This was a very challenging project, on a very tight time frame, but we delivered on time.