top of page
Project: A6 Dualling Randalstown to Castledawson
Client: Farrans Grahams JV
Duration: On-going
As works progress towards completion on the new Dual Carriageways, we are continuing to do a variety of different tasks throughout the project, from finishing top soiling works on embankments and side roads, to the formation of Retention Ponds at various locations throughout the job. We have also completed the works for the new B18 roadway from Toomebridge, which opened to traffic recently. These works included the box cut of the road, the levelling of stone to formation level, drainage connections, landscaping and kerbing works. Stay tuned for updates as completion isn't anticipated until 2020.

front photo

20190606_162211_resized

20190830_151113_resized

20190830_151111_resized

20190822_160648_resized

20190708_115026_resized

20190822_160351_resized

20190822_160446_resized

20190822_160642_resized
bottom of page