Project: Bushmills Distillery Cased Goods Extension
Client: Heron Bros Ltd
Duration: 5 months
Heron Bros tasked us to complete all civil works on this project, which included all foundation works, foul and storm drainage, ducting and kerbing works. LLS excavated out for a large dock leveller at the rear of the building, along with a widening of the existing access roads through the site. Due to the large number of heavy good vehicles using the site we installed a large quantity of Trief kerbs along the roadway as an added safety precaution. Due to the level changes from the new building to existing site we placed gabion baskets as a means of soil retainment.