Project: Translink Belfast

Client: Henry Brothers LTD

Duration: 20 months

We have recently completed works on the new Translink workshop located on Duncrue Street in Belfast. Works involved included bringing up levels across the site, approx 40000m2, for associated piling works. Strom drainage was installed up the existing Northern Road and into the site for all storm water discharge. A new headwall and Valve was placed at Pollock Dock. Four large Interceptor tanks where installed at various location throughout the site, which required sheet piling due to the depth and type of ground. Due to the location of the works, we dealt with a large quantity of contaminated material which was disposed off site in landfill. Preparation of all areas for tarmac was carried out by ourselves including all kerbing works.

IMG-20181015-WA0002
IMG-20181015-WA0002
press to zoom
20180524_151636
20180524_151636
press to zoom
20181123_154653
20181123_154653
press to zoom
20181123_154550
20181123_154550
press to zoom
IMG-20181015-WA0001
IMG-20181015-WA0001
press to zoom
IMG-20181015-WA0000
IMG-20181015-WA0000
press to zoom
20181130_150413
20181130_150413
press to zoom
20181128_140032
20181128_140032
press to zoom
20181128_140128
20181128_140128
press to zoom